The tank is clearing. Things are looking up. The green star polyps are beginning to open after two weeks closed. I was pretty excited about this. Things are calming down. Zoos are opening that haven't been open for a while and our leathers are struggling to make a come back. The fish look happy again.
On the house front things are going well. Danny got the meter service moved this week to the other side of the garage so that we can move our living room wall out five feet to the garage. Well done Daniel.
We got the material for the kitchen cabinets this week and the rest of the dry wall that we should need for the interior of the house. We're getting things done.
Next step will be installing drain lines between the house and garage so that we can pour the concrete for our extension. Our reward for completion of the house is going to be a 150 g. tank. With the tank room being under the stairs to reduce noise in the living room. It'll have auto top off and drain right to our drain lines. We have lots of ideas. Lots that we got from RS.
Later down the road we are considering adding a wraparound balcony off our bedroom. And even further down the road we may add a master bedroom onto the first floor. Saving the stairs for the younger members of our family.